Regular reviewing of the design (periodic evaluation) and quality of execution (performance monitoring) should be planned, with the aim of correcting any failures in the process, or improving design in light of recent information and knowledge.
14.1 WHO will regularly review the performance and design of the surveillance strategies
Institution or team responsible, for instance
14.2 HOW are reviews going to be performed
Criteria for evaluation and performance monitoring, information collection and use, etc.
14.3 WHEN/HOW OFTEN?
Frequency of performance monitoring and periodic evaluation. For instance quarterly or yearly.
salmonella_dublin_cattle.pdf
You could leave a comment if you were logged in.