Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
the-evaluation-question [2018/08/01 12:38]
thorsten
the-evaluation-question [2018/08/01 12:42] (current)
thorsten [[[/The-Evaluation-question#eva-biggest-benefit|Evaluation of Biggest Net Benefit]]]
Line 12: Line 12:
 ====== The different type of Evaluation questions ====== ====== The different type of Evaluation questions ======
 //(note : the numbering of the question is referring to the numbering used in the EVA tool)//\\ The Evaluation question could be descriptive:​ what is the current situation, how is my system organised?; \\ it could be causal, trying to understand the factors that contributes to the results of the surveillance,​ for example what is the effectiveness of the system?;\\ It could be a synthesis question, trying to understand what could be done better and which alternatives will be best, for example, is my system/​component cost-effective?​\\ It could be an action question related to identifying changes that should be made to improve the system.\\ It is important to notice that those questions could be related and more than one type of question could be asked during an evaluation process: for example if someone wants to know how is the surveilllance system performing, what are the factors influencing its effectiveness and which corrective action should be implemented to improve it.\\ \\  //(note : the numbering of the question is referring to the numbering used in the EVA tool)//\\ The Evaluation question could be descriptive:​ what is the current situation, how is my system organised?; \\ it could be causal, trying to understand the factors that contributes to the results of the surveillance,​ for example what is the effectiveness of the system?;\\ It could be a synthesis question, trying to understand what could be done better and which alternatives will be best, for example, is my system/​component cost-effective?​\\ It could be an action question related to identifying changes that should be made to improve the system.\\ It is important to notice that those questions could be related and more than one type of question could be asked during an evaluation process: for example if someone wants to know how is the surveilllance system performing, what are the factors influencing its effectiveness and which corrective action should be implemented to improve it.\\ \\ 
-===== **Component level / EFFECTIVENESS EVALUATION =====+===== Component level / EFFECTIVENESS EVALUATION =====
 \\  \\ 
  
Line 22: Line 22:
 \\  \\ 
  
-  * ==== Cost-optimisation ====+ ==== Cost-optimisation ====
 \\  \\ 
  
Line 30: Line 30:
 \\  \\ 
  
-  * ==== Evaluation of Net Benefit ====+==== Evaluation of Net Benefit ====
 \\  \\ 
  
Line 40: Line 40:
 \\  \\ 
  
-  * ==== Evaluation of Biggest Benefit ====+==== Evaluation of Biggest Benefit ====
 \\  \\ 
  
Line 48: Line 48:
 | Q6b. Benefit to be measured in non-monetary terms or to be expressed as an effectiveness measure \\ | Effectiveness\\ Non-monetary benefit\\ Cost\\ | Cost effectiveness assessment\\ | | Q6b. Benefit to be measured in non-monetary terms or to be expressed as an effectiveness measure \\ | Effectiveness\\ Non-monetary benefit\\ Cost\\ | Cost effectiveness assessment\\ |
 | Q6c. Benefit to be measured in both monetary and non-monetary terms (or to be expressed as an effectiveness measure) \\ | Monetary benefit \\ Non-monetary benefit/​effectiveness\\ Cost\\ | cost benefit and cost effectiveness assessment\\ | | Q6c. Benefit to be measured in both monetary and non-monetary terms (or to be expressed as an effectiveness measure) \\ | Monetary benefit \\ Non-monetary benefit/​effectiveness\\ Cost\\ | cost benefit and cost effectiveness assessment\\ |
-\\  
  
-  * ==== [[/​The%20Evaluation%20question#​eva%20biggest%20benefit|Evaluation of Biggest Net Benefit]] ==== +==== Evaluation of Biggest Net Benefit ====
-\\ +
  
 | **Evaluation question **\\ | **Evaluation criteria**\\ | **Evaluation method **\\ | | **Evaluation question **\\ | **Evaluation criteria**\\ | **Evaluation method **\\ |
  • the-evaluation-question.1533119898.txt.gz
  • Last modified: 2018/08/01 12:38
  • by thorsten