Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
the-evaluation-question [2017/11/20 08:48]
127.0.0.1 external edit
the-evaluation-question [2018/08/01 12:42] (current)
thorsten [[[/The-Evaluation-question#eva-biggest-benefit|Evaluation of Biggest Net Benefit]]]
Line 1: Line 1:
 //This page has been developed by M.Peyre, CIRAD-AGIRs;​ B. Haesler, RVC and L.Hoinville,​ RVC//\\ \\  //This page has been developed by M.Peyre, CIRAD-AGIRs;​ B. Haesler, RVC and L.Hoinville,​ RVC//\\ \\ 
-====== Table of Contents ====== 
-[[#​Importance of the evaluation question|Importance of the evaluation question]][[#​How to define the evaluation question?​|How to define the evaluation question?​]][[#​toc2| ]][[#The different type of Evaluation questions|The different type of Evaluation questions]][[#​The different type of Evaluation questions-Component level / EFFECTIVENESS EVALUATION|Component level / EFFECTIVENESS EVALUATION]][[#​The different type of Evaluation questions-Component level / ECONOMIC EVALUATION|Component level / ECONOMIC EVALUATION]][[#​The different type of Evaluation questions-Component level / ECONOMIC EVALUATION-Cost-optimisation|Cost-optimisation]][[#​The different type of Evaluation questions-Component level / ECONOMIC EVALUATION-Evaluation of Net Benefit|Evaluation of Net Benefit]][[#​The different type of Evaluation questions-Component level / ECONOMIC EVALUATION-Evaluation of Biggest Benefit|Evaluation of Biggest Benefit]][[#​The different type of Evaluation questions-Component level / ECONOMIC EVALUATION-Evaluation of Biggest Net Benefit|Evaluation of Biggest Net Benefit]][[#​The different type of Evaluation questions-System or component level / PROCESS EVALUATION|System or component level / PROCESS EVALUATION]][[#​The different type of Evaluation questions-System level / EFFECTIVENESS EVALUATION|System level / EFFECTIVENESS EVALUATION]][[#​toc12| ]] 
 ====== Importance of the evaluation question ====== ====== Importance of the evaluation question ======
 An evaluation comes with a cost, the process could be ressources demanding (both in terms of human and financial ressources) according to the type and level of evaluation performed. An evaluation should be therefore done with a clear objective, which comes with one or multiple clearly formulated question. This will ensure framing the evaluation process exactly to the needs and to ensure saving ressources\\ \\  An evaluation comes with a cost, the process could be ressources demanding (both in terms of human and financial ressources) according to the type and level of evaluation performed. An evaluation should be therefore done with a clear objective, which comes with one or multiple clearly formulated question. This will ensure framing the evaluation process exactly to the needs and to ensure saving ressources\\ \\ 
Line 11: Line 9:
   * Which economic evaluation question : cost-optimisation,​ cost effectiveness,​ cost-benefit ?   * Which economic evaluation question : cost-optimisation,​ cost effectiveness,​ cost-benefit ?
 ===   === ===   ===
-As part of the RISKSUR project, a guidance pathway was created to assist with the choice of the evaluation question. This pathway is part of the EVA tool and could be used by [[http://webtools.fp7-risksur.eu/​evaluation/​evaPage|clicking on this link.]]\\ Click [[/​Evaluation%20question%20guidance%20pathway|here for more information on this guidance pathway]]. \\ \\ +As part of the RISKSUR project, a guidance pathway was created to assist with the choice of the evaluation question. This pathway is part of the EVA tool and could be used by [[https://survtools.org/​evaluation/​|clicking on this link.]]\\ Click [[/​Evaluation-question-guidance-pathway|here for more information on this guidance pathway]]. \\ \\ 
 ====== The different type of Evaluation questions ====== ====== The different type of Evaluation questions ======
 //(note : the numbering of the question is referring to the numbering used in the EVA tool)//\\ The Evaluation question could be descriptive:​ what is the current situation, how is my system organised?; \\ it could be causal, trying to understand the factors that contributes to the results of the surveillance,​ for example what is the effectiveness of the system?;\\ It could be a synthesis question, trying to understand what could be done better and which alternatives will be best, for example, is my system/​component cost-effective?​\\ It could be an action question related to identifying changes that should be made to improve the system.\\ It is important to notice that those questions could be related and more than one type of question could be asked during an evaluation process: for example if someone wants to know how is the surveilllance system performing, what are the factors influencing its effectiveness and which corrective action should be implemented to improve it.\\ \\  //(note : the numbering of the question is referring to the numbering used in the EVA tool)//\\ The Evaluation question could be descriptive:​ what is the current situation, how is my system organised?; \\ it could be causal, trying to understand the factors that contributes to the results of the surveillance,​ for example what is the effectiveness of the system?;\\ It could be a synthesis question, trying to understand what could be done better and which alternatives will be best, for example, is my system/​component cost-effective?​\\ It could be an action question related to identifying changes that should be made to improve the system.\\ It is important to notice that those questions could be related and more than one type of question could be asked during an evaluation process: for example if someone wants to know how is the surveilllance system performing, what are the factors influencing its effectiveness and which corrective action should be implemented to improve it.\\ \\ 
-===== **Component level / EFFECTIVENESS EVALUATION** =====+===== Component level / EFFECTIVENESS EVALUATION =====
 \\  \\ 
  
Line 24: Line 22:
 \\  \\ 
  
-  * ==== Cost-optimisation ====+ ==== Cost-optimisation ====
 \\  \\ 
  
Line 32: Line 30:
 \\  \\ 
  
-  * ==== Evaluation of Net Benefit ====+==== Evaluation of Net Benefit ====
 \\  \\ 
  
Line 42: Line 40:
 \\  \\ 
  
-  * ==== Evaluation of Biggest Benefit ====+==== Evaluation of Biggest Benefit ====
 \\  \\ 
  
Line 50: Line 48:
 | Q6b. Benefit to be measured in non-monetary terms or to be expressed as an effectiveness measure \\ | Effectiveness\\ Non-monetary benefit\\ Cost\\ | Cost effectiveness assessment\\ | | Q6b. Benefit to be measured in non-monetary terms or to be expressed as an effectiveness measure \\ | Effectiveness\\ Non-monetary benefit\\ Cost\\ | Cost effectiveness assessment\\ |
 | Q6c. Benefit to be measured in both monetary and non-monetary terms (or to be expressed as an effectiveness measure) \\ | Monetary benefit \\ Non-monetary benefit/​effectiveness\\ Cost\\ | cost benefit and cost effectiveness assessment\\ | | Q6c. Benefit to be measured in both monetary and non-monetary terms (or to be expressed as an effectiveness measure) \\ | Monetary benefit \\ Non-monetary benefit/​effectiveness\\ Cost\\ | cost benefit and cost effectiveness assessment\\ |
-\\  
  
-  * ==== [[/​The%20Evaluation%20question#​eva%20biggest%20benefit|Evaluation of Biggest Net Benefit]] ==== +==== Evaluation of Biggest Net Benefit ====
-\\ +
  
 | **Evaluation question **\\ | **Evaluation criteria**\\ | **Evaluation method **\\ | | **Evaluation question **\\ | **Evaluation criteria**\\ | **Evaluation method **\\ |
  • the-evaluation-question.1511164102.txt.gz
  • Last modified: 2017/11/20 08:48
  • by 127.0.0.1