Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
evaluation-question-guidance-pathway [2018/08/01 14:07]
thorsten
evaluation-question-guidance-pathway [2019/03/26 09:50] (current)
marisa
Line 1: Line 1:
-As part of the RISKSUR project, a decision tree was created to assist with the choice of the evaluation question.\\ The following list of questions was arranged in a logical sequence in a decision tree in order to help the evaluator to define the evaluation question.\\  +As part of the RISKSUR project, a decision tree was created to assist with the choice of the evaluation question ​(the full decision tree diagram is available here: {{ :​files:​eva_q_pathway_13062015.pdf |}}\\ The following list of questions was arranged in a logical sequence in a decision tree in order to help the evaluator to define the evaluation question.\\  
-====== ​**QUESTION 1: Do you want to evaluate or improve at component or system level** ======+====== QUESTION 1: Do you want to evaluate or improve at component or system level ======
   - **Choose Component**:​ if your are comparing different surveillance designs (e.g.current versus novel)   - **Choose Component**:​ if your are comparing different surveillance designs (e.g.current versus novel)
   - **Choose System**: if you want to assess the strengths and weaknesses of the whole system (including all components) ; the system approach does not allow to compare 2 or more components   - **Choose System**: if you want to assess the strengths and weaknesses of the whole system (including all components) ; the system approach does not allow to compare 2 or more components
  • evaluation-question-guidance-pathway.1533125223.txt.gz
  • Last modified: 2018/08/01 14:07
  • by thorsten