Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
assesment-methods [2018/08/01 14:04]
thorsten [Sensitivity]
assesment-methods [2018/08/01 14:05] (current)
thorsten [Timeliness]
Line 135: Line 135:
 | **System mapping**\\ | \\ | Provide a detailed description of the surveillance system network of actors and actions linking the different actors together.\\ | No standard method available. Should be performed by people with very good knowledge of the system.\\ \\  Do not provide information on the strenghts and weaknesses, should be combined with SWOT/OASIS or SERVAL method\\ | | **System mapping**\\ | \\ | Provide a detailed description of the surveillance system network of actors and actions linking the different actors together.\\ | No standard method available. Should be performed by people with very good knowledge of the system.\\ \\  Do not provide information on the strenghts and weaknesses, should be combined with SWOT/OASIS or SERVAL method\\ |
 | \\ | \\ | \\ | \\ | | \\ | \\ | \\ | \\ |
-\\  
-====== ​  ​====== 
 ====== Timeliness ====== ====== Timeliness ======
  
Line 153: Line 151:
  
 | **Method type**\\ | **References**\\ | **Strengths**\\ | **Limits**\\ | \\ | | **Method type**\\ | **References**\\ | **Strengths**\\ | **Limits**\\ | \\ |
-| **Structured questionnaire**\\ **survey**\\ **([[http://​www.plateforme-esa.fr/​node/​62|OASIS fr]]**\\ **[[/​Surveillance%20system%20organisation|OASIS En]])**\\ | Hendrikx et al., 2011\\ | Allows to identify targeted corrective actions\\ | Scoring. Not a real measure of timeliness. Based on pre-defined requirement criteria which may not apply to all cases.\\ | \\ |+| **Structured questionnaire**\\ **survey**\\ **([[http://​www.plateforme-esa.fr/​node/​62|OASIS fr]]**\\ **[[/​Surveillance-system-organisation|OASIS En]])**\\ | Hendrikx et al., 2011\\ | Allows to identify targeted corrective actions\\ | Scoring. Not a real measure of timeliness. Based on pre-defined requirement criteria which may not apply to all cases.\\ | \\ |
  • assesment-methods.1533125092.txt.gz
  • Last modified: 2018/08/01 14:04
  • by thorsten