Differences
This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
|
sidebar [2018/07/31 14:31] thorsten |
sidebar [2020/03/06 10:47] (current) marisa |
||
|---|---|---|---|
| Line 1: | Line 1: | ||
| - | **1.** [[Welcome-to-RISKSUR-tools|Welcome page]]\\ | + | **1.** [[Start|Welcome page]]\\ |
| **1.1** [[QUICK-ACCESS|QUICK ACCESS]]\\ | **1.1** [[QUICK-ACCESS|QUICK ACCESS]]\\ | ||
| ---- | ---- | ||
| Line 8: | Line 8: | ||
| **2.3** [[What-is-economic-evaluation|What is economic evaluation?]]\\ | **2.3** [[What-is-economic-evaluation|What is economic evaluation?]]\\ | ||
| **2.4** [[Evaluation-frameworks|Evaluation frameworks]]\\ | **2.4** [[Evaluation-frameworks|Evaluation frameworks]]\\ | ||
| - | **2.5** [[Challenges-in-animal-health-evaluation|Challenges in animal health surveillance evaluation]]\\ | + | **2.5** [[Challenges-in-animal-health-surveillance-evaluation|Challenges in animal health surveillance evaluation]]\\ |
| ---- | ---- | ||
| **3.** [[The-Evaluation-process|The Evaluation process]]\\ | **3.** [[The-Evaluation-process|The Evaluation process]]\\ | ||
| Line 19: | Line 19: | ||
| **3.2.2** [[Organisational-attributes-assessment-methods|Organisational attributes assessment methods]]\\ | **3.2.2** [[Organisational-attributes-assessment-methods|Organisational attributes assessment methods]]\\ | ||
| **3.2.2.1** [[Surveillance-system-organisation|Surveillance system organisation]]\\ | **3.2.2.1** [[Surveillance-system-organisation|Surveillance system organisation]]\\ | ||
| + | **3.2.2.2** [[Quality of the collaboration|Quality of the collaboration]]\\ | ||
| **3.2.3** [[Functional-attributes-assessment-methods|Functional attributes assessment methods]]\\ | **3.2.3** [[Functional-attributes-assessment-methods|Functional attributes assessment methods]]\\ | ||
| **3.2.3.1** [[Acceptability-and-engagement|Acceptability and engagement]]\\ | **3.2.3.1** [[Acceptability-and-engagement|Acceptability and engagement]]\\ | ||
| Line 28: | Line 29: | ||
| **4.** [[Economic-evaluation-methods|Economic evaluation methods]]\\ | **4.** [[Economic-evaluation-methods|Economic evaluation methods]]\\ | ||
| **4.1** [[Cost-analysis|Cost analysis]]\\ | **4.1** [[Cost-analysis|Cost analysis]]\\ | ||
| - | **4.2** [[Economic-evaluation-methods#CEA|Cost effectiveness analysis (CEA)]]\\ | + | **4.2** [[economic-evaluation-methods#cost-effectiveness_analysis_cea|Cost effectiveness analysis (CEA)]]\\ |
| - | **4.3** [[Economic-evaluation-methods#Least-cost|Least cost analysis]]\\ | + | **4.3** [[economic-evaluation-methods#least-cost_analysis|Least cost analysis]]\\ |
| - | **4.4** [[Economic-evaluation-methods#CBA|Cost benefit analysis (CBA)]]\\ | + | **4.4** [[economic-evaluation-methods#cost-benefit_analysis|Cost benefit analysis (CBA)]]\\ |
| ---- | ---- | ||
| **5.** [[Evaluator-Best-Practices|Evaluator Best Practices]]\\ | **5.** [[Evaluator-Best-Practices|Evaluator Best Practices]]\\ | ||